MANULIFE

Adoption Date: 11 May 2005
Country of Headquarters: Canada
Region of Headquarters: North America
Institutional Reporting Hyperlink: http://www.manulife.com/public/files/201/1/MFC_PAS_2015.pdf
Current EPFI Reporting Year/Period: 2015
EPFI Reporting in Compliance: Yes

 

Please read the important notes and disclaimer for further information on 'EPFI Reporting', compliance and publication on the Equator Principles Association website.


Further information on this EPFI may be obtained through the Institutional Reporting Hyperlink above.


PROJECT FINANCE ADVISORY SERVICES


Total number mandated in the reporting period: 20

Sector
Total
Mining
Infrastructure 1
Oil & Gas
Power 15
Others 4
Sub Total
20

 

Region
Total
Americas 18
Europe, Middle East & Africa 1
Asia Pacific 1
Sub Total
20

 

PROJECT FINANCE TRANSACTIONS


Total number that reached financial close in the reporting period: 20

Totals
0
10
10
Sector
Category A
Category B
Category C
Mining


Infrastructure

1
Oil & Gas


Power
10 5
Others

4
Region
Category A
Category B
Category C
Americas
10 8
Europe, Middle East & Africa

1
Asia Pacific

1
Country Designation
Category A
Category B
Category C
Designated1
10 10
Non-Designated


Independent Review
Category A
Category B
Category C
Yes
3 4
No
7 6
Totals
0
10
10

1Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment. For the list of Designated Countries, go to: http://www.equator-principles.com/index.php/ep3/designated-countries


PROJECT NAME REPORTING FOR PROJECT FINANCE TRANSACTIONS

No. Project Name
Sector
Host Country Name/ Project Location Year of Financial Close
1 Aria Solar Plant Power Canada 2015
2 Big Silver Creek Power Canada 2015
3 Boulder Creek and Upper Lillooet River Power Canada 2015
4 CED California Holdings Power USA 2015
5 Meerwind Süd │Ost Power Germany 2015
6 Pio Pico Energy Center Power USA 2015
7 Victorian Desalination Project Infrastructure Australia 2015


13 projects were not disclosed as per the disclosure conditions specified in Annex B of the Equator Principles.


PROJECT-RELATED CORPORATE LOANS


Total number that reached financial close in the reporting period: 0


IMPLEMENTATION OF THE EQUATOR PRINCIPLES

Further information on Manulife's implementation reporting can be found at:
http://www.manulife.com/public/files/201/1/MFC_PAS_2015.pdf